EXTERNAL LIGHTING

NORTHERN SPIRE BRIDGE SUNDERLAND

(LABOUR ONLY)

The bridge was constructed to the west side of the city over the River Wear, with the purpose of reducing traffic congestion. This contract required us to travel to Belgium to complete the electrical first and second fixed prior to the bridge being shipped in one piece. 

  • Cable Containment
  • LV Mains Distribution
  • Small Power
  • Lighting
  • Emergency Lighting
  • Amenity Lighting
  • Access Control
  • Mechanical wiring
  • Electrical Testing & Commissioning